Notes for bathtubs installation

The bathtub is an indispensable part of our home life, so what matters should we pay attention to when installing bathtubs as the finishing touch in the bathroom? Today, we will give you an introduction.

 

(i) Test whether the water is leaking

 

Place the bathtub before the installation of the water fittings, do 24 hours closed water,

see whether the bathtub has leaks, pay special attention to the upper overflow.

24 hours closed water is very difficult to do, outside the bathroom,

pour on two buckets of water, try a good bathtub to water, so that the operation is more convenient.

 

(ii) Levelling of the bathtub

 

When placing the bathtub,

pay attention to the other end of the downspout to be slightly higher than the end of the downspout,

so that the drainage is not smooth in the future.

This will depend on the situation.

modern bath tubs

modern bath tubs

(iii) Sand filling

 

Although the bathtub is strong,

its thermal conductivity is very fast and the sand should be laid firmly and smashed at the bottom of the bathtub.

The tiler also recommends the use of foam,

which is not as liquid as river sand and is ideal for filling all the gaps.

During the sand filling process, it is a question of how to keep the sand from leaking into the drainpipe.

After all the work has been completed, test the water again.

 

(iv) Leave access openings

 

Leave a hole 300mm high and 400mm wide at the downspout,

intercept a mouth according to the size,

intercept a wooden board (thickness 40mm) which has been treated with waterproof and anti-corrosion according to the size,

and stick the bricks on the board according to the calculated number

and arrangement of bricks with 903 construction adhesive.

The edges of the bricks are smear with sealant and set on the box,

this is to facilitate the future maintenance of the bathtub drainage system.

 

(v) Tiling

 

It is not necessary to scratch the brick of the bathtub,

lay the table of red bricks, smear a layer of cement mortar on the surface,

and then wait for two days to paste the bricks again,

it is very troublesome to paste the bricks,

as the ground is left sloping, and the bathtub is flat,

so each big brick should be polished into different sizes,

it is not possible to polish a lot at once, it is easy to grind more,

and it is necessary to grind again and again.

The top edge of the tiles should be tucked under the rounded edge of the bathtub so that no sunny corners are formed.

 

Follow us for more bathroom information.

Share this story